falch jet man falch logo wow
project name
volume to be removed, m³
pump power machine, kW/machine
working pressure, bar
number of machines
number of jetting hours per day, h/d
number of jetting days per week, d/w
jetting method
removal area
concrete quality
removal depth, cm
steel reinforcement

project calculation
jetting performance total m³ / h
jetting performance total, m³ / day
time requirement min / m³
time requirement h / m³
project time total, h
project time total, jetting days
project time total, weeks
spec. water consumption, m³ water / m³ concrete
water consumption total, m³ / day

reset print

the determined values are non-binding recommendations.
the time specifications are pure jetting times.
in the calculation no setup times, breaks, work stoppages, etc. are included.
there are flat-rate averages of hundreds of projects and several millions m² blasted surfaces, however, which can differ greatly in individual projects!