新项目报道

cleaning a tartan sports field

falch cleans 800 m² tartan sports field

17.05.2018

in order to get the heavily polluted hard course in the monastary yard of blaubeuren back into good condition for a charity sporting event, the apprentices of the falch gmbh agreed to clean the tartan area as part of an apprenticeship project.更多...

pipe cleaning with 3000 bar

declaration of war on roots in sewer pipes

24.04.2018

the motorway maintenance authorities recently awarded rs kanal- und umweltservice gmbh the contract to clean a sewer running alongside federal highway b27 near balingen.更多...

anticorrosion works at moerdijk bridge

采用2500 bar高压水系统维修穆尔代克大桥(moerdijk !

20.11.2017

跨越莱茵河支流 “het hollands diep” 港湾的穆尔代克大桥是鹿特丹港和安特卫普港之间最重要的火车运输纽带之一。更多...

falch climb rob 125 for corrosion protection

ortec集团采用爬壁机器人climb rob 125对储油罐进行清洗

12.07.2017

ortec 集团 拿到清洗图卢兹罐区清洗储油罐的任务。储油罐需要定期进行清洗,以便能够及时发现储油罐外部可能会出现的腐蚀锈点。 更多...

concrete renovation with 2500 bar

almi-tech refurbishes 11,000 m² on the prague viaduct of "nuselský most"

17.05.2017

the nuselský most bridge connects two districts of the city of prague, nové mesto and nusle, over the nusle valley and constitutes the most important north-south connection in the city.更多...

[Translate to Chinese:] falch water jetting tunnel project milano

3V vitali srl公司维修米兰市内隧道:凿除130 m³混凝土

20.07.2016

意大利米兰的via spoleto隧道将近200米长,位于米兰中心火车站地下。 建筑公司 3V vitali srl 拿到了这个包括隧道维修任务的这个项目总包。更多...

concrete renovation with water jetting robot

在手术台上空凿除混凝土: 海涅 施密德维修弗莱堡大学附属医院直升机起降场

03.06.2015

弗莱堡大学附属医院是德国第三大医院。 在新建的急诊中心建成另外一个直升机起降场后,对旧的起降场进行维修成了迫在眉睫的任务。更多...

Displaying results 1 to 7 out of 42

1

2

3

4

5

6

Next >