


the pipe bridge near wassen, having a length of 88.5 metres, is unique in the world. the renovation work included the removal of approx. 230 m³ of concrete from the sliding tracks. in addition, 34 bore holes, each having a depth of 15.30 m needed to be roughened up. in order to speed up the removal as much as possible, the flat surfaces were stripped using a robot. the falch T25 was used for the touch-up work and for the areas which could not be reached by the robot.больше...
with its over 36,000 seats, the tottenham hotspur white hart lane stadium is one of the 15 largest football stadiums in great britain. a renovation campaign involved the cleaning of the running track around the pitch. the surface exhibited severe dirt contamination and so it was decided to use the falch scater and the 300 bar ultra high pressure blasting unit T3H for the cleaning. the cleaning was carried out over a five day period in double lance operation mode. just about 90 m² of surface coulбольше...
the grant bridge, having a total length of over 1,900 m and a width of 25.5 m, with six access and exit lanes, is one of the most important road bridges in bucharest. the bridge support structure had been damaged as a result of the severe traffic loading and the effects of the weather. больше...
around 4,200 m² of down-pipes had to be renovated in tende in the south of france. in order to provide optimum preparation of the substrate for a new coating, the ultra high pressure blasting unit R20/400 was used. in order to reach the site in the middle of the french alps, the falch unit was flown in by helicopter. больше...
the general renovation of the luegbrücke bridge on the brenner motorway took around two years. 13,000 m² of surface area was processed with three 2,500 bar ultra high pressure blasting units. an approx. 2 cm thick bitumen layer had to be removed from the roadway.больше...
on the occasion of the 50 year anniversary of the LTU, one of the first aircraft of the airline, a "de havilland dove" was restored. firstly, the entire aircraft had to have its paint removed. two processes were available: chemical removal or high pressure water blasting.больше...
with a height of around 125 metres, the chimney in the jura cement factory is the second highest structure in the aarau canton. renovation of the construction was urgently required. initially the entire surface of the chimney had to have the coating removed. in just eight days the 2,000 m² area had the coating removed.больше...
Displaying results 22 to 28 out of 29