anticorrosion works at moerdijk bridge

moerdijk bridge renovated with four 2500 bar systems!

20.11.2017

the moerdijk bridge across the branch of the rhein named “het hollands diep” is one of the most important train connections between the harbours of rotterdam and antwerpen.[više]

falch climb rob 125 for corrosion protection

ortec groupe cleans oil tanks using climb rob 125

12.07.2017

the ortec groupe was tasked with cleaning oil tanks at a fuel depot in toulouse. these regular cleaning operations are necessary to detect possible corrosion damage on the external surface of the tanks as early as possible. [više]

concrete renovation with 2500 bar

almi-tech refurbishes 11,000 m² on the prague viaduct of "nuselský most"

17.05.2017

the nuselský most bridge connects two districts of the city of prague, nové mesto and nusle, over the nusle valley and constitutes the most important north-south connection in the city.[više]

[Translate to Croatian:] falch water jetting tunnel project milano

3V vitali srl renovates tunnel in milan's inner city: 130 m³ of concrete removed

20.07.2016

the via spoleto tunnel in milan (italy), which runs under the tracks of the ramilano centrale train station, is about 200 m in length. the construction company 3V vitali srl won the contract, which includes such work as the renovation of the tunnel.[više]

concrete renovation with water jetting robot

concrete removal over the operating table: heinrich schmid renovates the heliport at the freiburg university clinic

03.06.2015

the freiburg university clinic is the third largest clinic in germany. after an additional heliport was built during the construction of the emergency centre, it was high time to renovate the old heliport.[više]

[Translate to Croatian:] removal old paint, uhp water jetting project disney magic

tvrtka verlicoa je skinula boju sa "disney magic" broda pomoću devet falch-ovih uređaja!

26.03.2014

disney magic je jedan od četiri kruzera u disney cruise floti. brod, koji ima 84.000 bruto registriranih tona je dug cca. 300m, a ima kapacitet za 2700 putnika i 950 članova posade. [više]

[Translate to Croatian:] cleaning pipes with rotation nozzle

čišćenje 1.415 metara duge procesne linije na raverzibilnoj hidroelektrani u metzingenu!

24.01.2014

linija procesne vode na reverzibilnoj hidroelektrani u metzingenu  je duga više od 1,4 kilometara. debeli sloj pijeska i kamenca  se nataložio  na unutarnjoj stijenki cijevi tijekom godina. industrijska tvrtka za pružanje usluga WUNDERBAR Süd GmbH je dobila zadatak ukloniti ovaj 10 cm debeli sloj. u dogovoru s odjelom falch tehnologija primjene, znanstvenici su pokušavali pronaći optimalan način za  ponovno obnavljanje cjevovoda. Prvi testovi provedeni s ručnim kopljem (prikazano dolje lijevo) p[više]